The following is a draft plan for the Tasmania 2015 GTG. Further planning and reccies need to take place before final plans are set.
26th Sept- Arrive at Myrtle Park
27th Sept- Planned drive through forests and on beach
28th Sept- Transport day. Visiting waterfalls and local attractions. Arrive at Weldborough.
29th Sept- "North East Corner" loop drive.
30th Sept- Transport day. Travel down east coast. Arrive at Little Swanport.
1st Oct- "Southern Loop" drive.
2nd Oct- Transport day. Head north. Arrive at Longford for Presentations and evening meal.
3rd Oct- Pack up and goodbye day.
26th Sept- Arrive at Myrtle Park
27th Sept- Planned drive through forests and on beach
28th Sept- Transport day. Visiting waterfalls and local attractions. Arrive at Weldborough.
29th Sept- "North East Corner" loop drive.
30th Sept- Transport day. Travel down east coast. Arrive at Little Swanport.
1st Oct- "Southern Loop" drive.
2nd Oct- Transport day. Head north. Arrive at Longford for Presentations and evening meal.
3rd Oct- Pack up and goodbye day.
Comment