Template in place, with the instructions at hand(Safari, 4WD Action and most importantly PP)
Everything marked out ready to drill, very nervous at this point.
Got the holes drilled, not the best edge on the 95mm hole but bit of a file and some paint and job done. If you’re going to do this deffinately get a step drill, best money I’ve spent.
From this point things got tricky and I didn’t take any photos, nothing complicated just akward, trying to get the nuts on inside the inner guard (you should get a racheting spanner for this, it would have made life much easier), lining up the z piece that links the snorkle to the airbox and tighten up the hose clamps but job done
and I reckon it looks pretty good.
Comment