Time to get off my arse and put some progress shots on line.
Started life as a 2008 GXL Auto option pack 1 delivered on the 23May 2008.
Was to be fitted with ARB Sahara bar & tow bar.
Didn't get any shots with the Grandcraps fitted as they were only on the car for 15min after delivery. :lol:
Day1 Wrong bullbar fitted & after 1st mod 265X75R17 BF Goodrich AT's.

Next changes occurred at the WA tech day 2008 50mm lift with Bilsteins & Lovells springs.



Leachy was great with poly airs and suspension thanks Leachy.
Snorkel thanks to the tech day.

The markup thanks to Fishnut for letting Chippy practice on his car first. :wink:

Dam hard drilling holes in a car with less than 1000ks on the clock.

All drilled thanks Chippy... :shock:

Finished snorkel.

The most important bit thanks Russ.

Finished product of the Tech day.
Bullbar removed and bumper back on.

Sahara bar fitted finally.

Driving lights go on. 8)


Next with Camprite in tow.

At Settlers Beach

At Cossack
That's a start more to follow...... :mrgreen:
Started life as a 2008 GXL Auto option pack 1 delivered on the 23May 2008.
Was to be fitted with ARB Sahara bar & tow bar.
Didn't get any shots with the Grandcraps fitted as they were only on the car for 15min after delivery. :lol:
Day1 Wrong bullbar fitted & after 1st mod 265X75R17 BF Goodrich AT's.

Next changes occurred at the WA tech day 2008 50mm lift with Bilsteins & Lovells springs.



Leachy was great with poly airs and suspension thanks Leachy.
Snorkel thanks to the tech day.

The markup thanks to Fishnut for letting Chippy practice on his car first. :wink:

Dam hard drilling holes in a car with less than 1000ks on the clock.

All drilled thanks Chippy... :shock:

Finished snorkel.

The most important bit thanks Russ.

Finished product of the Tech day.
Bullbar removed and bumper back on.

Sahara bar fitted finally.

Driving lights go on. 8)


Next with Camprite in tow.

At Settlers Beach

At Cossack
That's a start more to follow...... :mrgreen:
Comment