Just installed my Grande 10000lbs this morning. all pretty straight forward although all bolts needed shortening. I ended up mounting the control box right next to the winch on the gearbox side, just needed to drill 2x 8mm holes for mounting. all cables are long enough in this configuration and the control box is accessible from the slot next to the fairlead opening. only thing i did as insurance is re-seal the control box to prevent water ingress.
Greenie
Greenie
Comment